The Greenwich Tree Conservancy, 500 members and supporters strong, believes that Eversource has not met the basic requirement to forecast electric loads based on historical data for the subject area of Greenwich, CT. Read GTC’s comments to the Connecticut Siting Council (CSC) on DOCKET NO. 461 below or download the pdf.